Mirabito 1 - Omer Tici; Ozgur Eminogle; Bugra Aydin; Ali Gorgun

From CS486wiki
Jump to navigationJump to search

Week 1 02/04/2024


Accomplishments:

● Back-end side discussed about code and new back-end member Mert learned the basics of the code.  
●  Code now works on machine-readable but still needs improvements.
●  Front-end side looked at the design goal and planned the structure.
●  System is integrated into computers.

Problems:

● There is an ETX character problem from the machine, back-end facing.
●  Front-end system is going to be built from scratch.

TO-DO:

● Find a solution for the ETX character problem.
● Update inventory report to machine-readable version.
● Basic steps for the skeleton will be implemented. 
● The login page will be designed as the beginning step.

Week 2 02/12/2024


Accomplishments:

● A new database will be designed and created until this week's meeting.
● The second part of the front end was created.
● The skeleton for the front end was created to have a well-organized structure.

Problems:

● Make the database match business requirements.

TO-DO:

● Update the database in the future and also update the code according to the new database.
● Starting to connect the front end with the database from the back end

Week 3 02/18/2024


Accomplishments:

● Get functions created.
● New attributes from the machine added to the database.
● The Front-end version on the git side has been updated.
● Get function connection has been planned.

Problems:

● None for the back-end.

TO-DO:

● Get more attributes from the machine.
● Starting to connect the front end with the database from the back end.