Mirabito

From CS486wiki
Jump to navigationJump to search

Date: 02/06/2022 Week 1

Attandence:Baran Ozgur Tas, Ali Mert Doganay, Emre Isiktekiner

Accomplishments:

- We arranged a meeting with Mr. Eric, Mr. Abhineet and Professor Jones for doing an introduction to this semester and a summary of last semester.

Problems:

- Group members waiting for the CPT's.

To-Do:

- Team members will work on connection between frontend and backend.


Date: 02/13/2022 Week 2


Attandence:Baran Ozgur Tas,Ali Mert Doganay,Emre Isiktekiner

Accomplishments:

- We got our CPT Approvals and new I20s.
- We arranged a meeting for discussing next steps with Mr Abhineet.

Problems:

- We could not arrange a meeting this week.

To-Do:

- Team members will work on connection between frontend and backend.


Date: 02/20/2022 Week 3

Attandence:Baran Ozgur Tas,Ali Mert Doganay,Emre Isiktekiner

Accomplishments:

- We arranged 2 meetings in Mirabito headquarters with Mr. Abhineet for improving our project.
- We arranged a meeting with Professor Jones and Mirabito team for discussing the project's current state.
- We implemented communication between the front-end and back-end for the Upload Code page.

- Now we are able to upload Pdf from the front-end, and read from the back-end side.
- We solved the Bitbucket connection problem and we successfully merged our codes.
- Group members got familiar with the HTTP methods.

Problems:

- No problems this week.

To-Do:

- We will prepare a report for the whole code and analyze what we're going to do.