Mirabito 1 - Omer Tici; Ozgur Eminogle; Bugra Aydin; Ali Gorgun: Difference between revisions
From CS486wiki
Jump to navigationJump to search
Content deleted Content added
No edit summary (change visibility) |
front-end (change visibility) |
||
| Line 51: | Line 51: | ||
'''Accomplishments:''' |
'''Accomplishments:''' |
||
● Post function developed (added new commands). |
● Post function developed (added new commands). |
||
● Front-end and Back-end have been connected with service. |
|||
● The third page has been improved to have a better UI for the user end. |
|||
'''Problems:''' |
'''Problems:''' |
||
| Line 58: | Line 61: | ||
● Get more attributes from the machine. |
● Get more attributes from the machine. |
||
● Starting to connect the front end with the database from the back end. |
● Starting to connect the front end with the database from the back end. |
||
● Going to continue with the next pages promising new features to the user-end. |
|||
Revision as of 03:24, 26 February 2024
Week 1 02/04/2024
Accomplishments:
● Back-end side discussed about code and new back-end member Mert learned the basics of the code. ● Code now works on machine-readable but still needs improvements. ● Front-end side looked at the design goal and planned the structure. ● System is integrated into computers.
Problems:
● There is an ETX character problem from the machine, back-end facing. ● Front-end system is going to be built from scratch.
TO-DO:
● Find a solution for the ETX character problem. ● Update inventory report to machine-readable version. ● Basic steps for the skeleton will be implemented. ● The login page will be designed as the beginning step.
Week 2 02/12/2024
Accomplishments:
● A new database will be designed and created until this week's meeting. ● The second part of the front end was created. ● The skeleton for the front end was created to have a well-organized structure.
Problems:
● Make the database match business requirements.
TO-DO:
● Update the database in the future and also update the code according to the new database. ● Starting to connect the front end with the database from the back end
Week 3 02/18/2024
Accomplishments:
● Get functions created. ● New attributes from the machine added to the database. ● The Front-end version on the git side has been updated. ● Get function connection has been planned.
Problems:
● None for the back-end.
TO-DO:
● Get more attributes from the machine. ● Starting to connect the front end with the database from the back end.
Week 4 02/25/2024
Accomplishments:
● Post function developed (added new commands). ● Front-end and Back-end have been connected with service. ● The third page has been improved to have a better UI for the user end.
Problems:
● Some of the commands are hard to store in the database re-design the database.
TO-DO:
● Get more attributes from the machine. ● Starting to connect the front end with the database from the back end. ● Going to continue with the next pages promising new features to the user-end.