Mirabito 1 - Omer Tici; Ozgur Eminogle; Bugra Aydin; Ali Gorgun: Difference between revisions

From CS486wiki
Jump to navigationJump to search
Content deleted Content added
front-end   (change visibility)
No edit summary   (change visibility)
 
(14 intermediate revisions by the same user not shown)
Line 62: Line 62:
● Starting to connect the front end with the database from the back end.
● Starting to connect the front end with the database from the back end.
● Going to continue with the next pages promising new features to the user-end.
● Going to continue with the next pages promising new features to the user-end.


''<big><big>Week 5 3/11/2024 - Spring Break</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Now the function retrieves according to the latest date.
● Get all history created.
● Updated post function further now sends more commands into the database.
● The errors which are for the leaks and etc. are demonstrated at the front end.
● A number of decimal controls have been added.

'''Problems:'''
● None

'''TO-DO:'''
● Going to continue with the next pages promising new features to the user-end.
● Going to add remaining commands.

''<big><big>Week 6 3/18/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Connected and tested the new site.
● Added new section at UI showing symbols of alerts.



'''Problems:'''
● New site does not give information yet, working on it (probably going to be solved until this weeks meeting).

'''TO-DO:'''
● Going to add remaining commands.
● Going to include new sites into our UI.

''<big><big>Week 7 3/25/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● The system is updated for allowing the multiple sites(UI).
● The new cite is integrated to the system so now we can see the both sites not as hardcode.
● New Site table and commands created.

'''Problems:'''
● Still site numbers are limited.

'''TO-DO:'''
● Going to add remaining commands.

''<big><big>Week 8 4/1/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Started working on the delete function.
● Design improvement for add site.

'''Problems:'''
● No problem for the front end for now.

'''TO-DO:'''
● Going to focus on other sections like authentication, settings etc.

''<big><big>Week 9 4/8/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Now back end code is working by timer.
● New commands added.
● Front-end reconstructed so the refresh function can work
● Delete function is working properly in the front end

'''Problems:'''
● No problem for the back end and front end for now.

'''TO-DO:'''
● Going to focus on other commands.

''<big><big>Week 10 4/15/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Now we are using the back-end's post function in order to acquire updating data for the user-end.
● Back-end fetching more data from the machine now.

'''Problems:'''
● No problem for the back end and front end for now.

'''TO-DO:'''
● Going to focus on other commands.


''<big><big>Week 11 4/21/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Back-end added new commands.
● Reports part added for the Front-end

'''Problems:'''
● No problem for the front end for now.
● Some commands are not working on New Berlin.


'''TO-DO:'''
● Going to focus on other commands and presentation.


''<big><big>Week 12 4/28/2024</big></big>''
--------------------------------------------------------------------

'''Accomplishments:'''
● Back-end added new commands.
● Structure of presentation discussed and working on presentation as a group (back-end - front-end).|
● Presentation for front-end finished

'''Problems:'''
● No problem for the front end for now.
● Some commands are not working on New Berlin.

'''TO-DO:'''
● Going to focus on other commands and presentation.

Latest revision as of 02:57, 29 April 2024

Week 1 02/04/2024


Accomplishments:

● Back-end side discussed about code and new back-end member Mert learned the basics of the code.  
●  Code now works on machine-readable but still needs improvements.
●  Front-end side looked at the design goal and planned the structure.
●  System is integrated into computers.

Problems:

● There is an ETX character problem from the machine, back-end facing.
●  Front-end system is going to be built from scratch.

TO-DO:

● Find a solution for the ETX character problem.
● Update inventory report to machine-readable version.
● Basic steps for the skeleton will be implemented. 
● The login page will be designed as the beginning step.

Week 2 02/12/2024


Accomplishments:

● A new database will be designed and created until this week's meeting.
● The second part of the front end was created.
● The skeleton for the front end was created to have a well-organized structure.

Problems:

● Make the database match business requirements.

TO-DO:

● Update the database in the future and also update the code according to the new database.
● Starting to connect the front end with the database from the back end

Week 3 02/18/2024


Accomplishments:

● Get functions created.
● New attributes from the machine added to the database.
● The Front-end version on the git side has been updated.
● Get function connection has been planned.

Problems:

● None for the back-end.

TO-DO:

● Get more attributes from the machine.
● Starting to connect the front end with the database from the back end.

Week 4 02/25/2024


Accomplishments:

● Post function developed (added new commands).
● Front-end and Back-end have been connected with service. 
● The third page has been improved to have a better UI for the user end. 


Problems:

● Some of the commands are hard to store in the database re-design the database.

TO-DO:

● Get more attributes from the machine.
● Starting to connect the front end with the database from the back end.
● Going to continue with the next pages promising new features to the user-end.


Week 5 3/11/2024 - Spring Break


Accomplishments:

● Now the function retrieves according to the latest date.
● Get all history created.
● Updated post function further now sends more commands into the database.
● The errors which are for the leaks and etc. are demonstrated at the front end.
● A number of decimal controls have been added.

Problems:

● None

TO-DO:

● Going to continue with the next pages promising new features to the user-end.
● Going to add remaining commands.

Week 6 3/18/2024


Accomplishments:

● Connected and tested the new site.
● Added new section at UI showing symbols of alerts.


Problems:

● New site does not give information yet, working on it (probably going to be solved until this weeks meeting).

TO-DO:

● Going to add remaining commands.
● Going to include new sites into our UI.

Week 7 3/25/2024


Accomplishments:

● The system is updated for allowing the multiple sites(UI).
● The new cite is integrated to the system so now we can see the both sites not as hardcode.
● New Site table and commands created.

Problems:

● Still site numbers are limited.

TO-DO:

● Going to add remaining commands.

Week 8 4/1/2024


Accomplishments:

● Started working on the delete function.
● Design improvement for add site.

Problems:

● No problem for the front end for now.

TO-DO:

● Going to focus on other sections like authentication, settings etc.

Week 9 4/8/2024


Accomplishments:

● Now back end code is working by timer.
● New commands added.
● Front-end reconstructed so the refresh function can work
● Delete function is working properly in the front end

Problems:

● No problem for the back end and front end for now.

TO-DO:

● Going to focus on other commands.

Week 10 4/15/2024


Accomplishments:

● Now we are using the back-end's post function in order to acquire updating data for the user-end. 
● Back-end fetching more data from the machine now.

Problems:

● No problem for the back end and front end for now.

TO-DO:

● Going to focus on other commands.


Week 11 4/21/2024


Accomplishments:

● Back-end added new commands.
● Reports part added for the Front-end

Problems:

● No problem for the front end for now.
● Some commands are not working on New Berlin.


TO-DO:

● Going to focus on other commands and presentation.


Week 12 4/28/2024


Accomplishments:

● Back-end added new commands.
● Structure of presentation discussed and working on presentation as a group (back-end - front-end).|
● Presentation for front-end finished

Problems:

● No problem for the front end for now.
● Some commands are not working on New Berlin.

TO-DO:

● Going to focus on other commands and presentation.